Lockheed Martin Opens State of the Art Facility for Small Satellites Development

Lockheed Martin Opens State of the Art Facility for Small Satellites Development

Lockheed Martin has opened a new facility that streamlines small satellite (smallsat) processing to enable high-rate delivery. The multi-million dollar facility aims to house the company’s Space Development Agency (SDA) Tranche 1 Transport Layer satellites, among other smallsat programs and technology demonstrators.

The 20,000-square-foot low bay clean room, located on the company’s Waterton campus, will feature six scalable parallel assembly lines and is configurable to host different classifications of missions concurrently. Built with flow and throughput in mind, the center is tailored to accommodate all stages of smallsat development, including spacecraft-level functional and performance testing.

“Lockheed Martin is committed to providing advanced satellites of different sizes and capabilities to meet our customers’ needs and support their strategy to achieve greater orbital diversity,” said Johnathon Caldwell, vice president, and general manager for Military Space at Lockheed Martin. “This new facility is one of many investments our company has made to lower costs and to deliver scalable solutions with increased speed and agility, to provide 21st Century Security solutions for our customers.”   

The facility hosts dedicated testing capabilities, including thermal cycle and electromagnetic chambers, scaled to efficiently build and test satellites ranging in size from CubeSats to smallsats. The tailored fit reduces waste and optimizes energy and space, supporting the delivery of 180 satellites or more per year.

Lockheed Martin is currently developing more than 50 satellites for the SDA’s Transport Layer, which will provide military users with low-latency communication links through a resilient network of integrated capabilities from low-Earth orbit. Lockheed Martin’s 10 Tranche 0 Transport Layer satellites are expected to launch this year, while its 42 Tranche 1 satellites will soon move into processing in the new factory to support a 2024 launch.

Lockheed Martin continues to invest in strengthening advanced capabilities, infrastructure, and industry partnerships for our customers and will continue to transform our business operations to enhance quality, efficiency, and affordability.

Lockheed Martin plans to continue leveraging its longstanding strategic partnerships, including its diverse supplier base and will utilize its new facility for assembly, integration, and testing to optimize these relationships.

Click here to learn more about Lockheed Martin's Next Generation Space Capabilities.

Publisher: SatNow
Tags:-  SatelliteGround

GNSS Constellations - A list of all GNSS satellites by constellations

beidou

Satellite NameOrbit Date
BeiDou-3 G4Geostationary Orbit (GEO)17 May, 2023
BeiDou-3 G2Geostationary Orbit (GEO)09 Mar, 2020
Compass-IGSO7Inclined Geosynchronous Orbit (IGSO)09 Feb, 2020
BeiDou-3 M19Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M20Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M21Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 M22Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 I3Inclined Geosynchronous Orbit (IGSO)04 Nov, 2019
BeiDou-3 M23Medium Earth Orbit (MEO)22 Sep, 2019
BeiDou-3 M24Medium Earth Orbit (MEO)22 Sep, 2019

galileo

Satellite NameOrbit Date
GSAT0223MEO - Near-Circular05 Dec, 2021
GSAT0224MEO - Near-Circular05 Dec, 2021
GSAT0219MEO - Near-Circular25 Jul, 2018
GSAT0220MEO - Near-Circular25 Jul, 2018
GSAT0221MEO - Near-Circular25 Jul, 2018
GSAT0222MEO - Near-Circular25 Jul, 2018
GSAT0215MEO - Near-Circular12 Dec, 2017
GSAT0216MEO - Near-Circular12 Dec, 2017
GSAT0217MEO - Near-Circular12 Dec, 2017
GSAT0218MEO - Near-Circular12 Dec, 2017

glonass

Satellite NameOrbit Date
Kosmos 2569--07 Aug, 2023
Kosmos 2564--28 Nov, 2022
Kosmos 2559--10 Oct, 2022
Kosmos 2557--07 Jul, 2022
Kosmos 2547--25 Oct, 2020
Kosmos 2545--16 Mar, 2020
Kosmos 2544--11 Dec, 2019
Kosmos 2534--27 May, 2019
Kosmos 2529--03 Nov, 2018
Kosmos 2527--16 Jun, 2018

gps

Satellite NameOrbit Date
Navstar 82Medium Earth Orbit19 Jan, 2023
Navstar 81Medium Earth Orbit17 Jun, 2021
Navstar 78Medium Earth Orbit22 Aug, 2019
Navstar 77Medium Earth Orbit23 Dec, 2018
Navstar 76Medium Earth Orbit05 Feb, 2016
Navstar 75Medium Earth Orbit31 Oct, 2015
Navstar 74Medium Earth Orbit15 Jul, 2015
Navstar 73Medium Earth Orbit25 Mar, 2015
Navstar 72Medium Earth Orbit29 Oct, 2014
Navstar 71Medium Earth Orbit02 Aug, 2014

irnss

Satellite NameOrbit Date
NVS-01Geostationary Orbit (GEO)29 May, 2023
IRNSS-1IInclined Geosynchronous Orbit (IGSO)12 Apr, 2018
IRNSS-1HSub Geosynchronous Transfer Orbit (Sub-GTO)31 Aug, 2017
IRNSS-1GGeostationary Orbit (GEO)28 Apr, 2016
IRNSS-1FGeostationary Orbit (GEO)10 Mar, 2016
IRNSS-1EGeosynchronous Orbit (IGSO)20 Jan, 2016
IRNSS-1DInclined Geosynchronous Orbit (IGSO)28 Mar, 2015
IRNSS-1CGeostationary Orbit (GEO)16 Oct, 2014
IRNSS-1BInclined Geosynchronous Orbit (IGSO)04 Apr, 2014
IRNSS-1AInclined Geosynchronous Orbit (IGSO)01 Jul, 2013