Redwire Selected by NASA to Develop Technology for Building Critical Infrastructure on Moon

Redwire Selected by NASA to Develop Technology for Building Critical Infrastructure on Moon

Redwire Corporation, one of the leaders in space infrastructure for the next generation space economy, has been selected for a $12.9 million NASA Tipping Point award to prototype a first-of-its-kind manufacturing technology intended to build critical infrastructure on the surface of the Moon, including landing pads, roads and foundations for habitats. This technology could enable robust construction on the lunar surface to advance human and robotic operations, paving the way for a sustainable human presence and a dynamic lunar economy.

“Lunar sustainability is at the very heart of the Artemis program.  Developing the technology to create infrastructure on the Moon to support landing, habitation, and commercial operations will enable the robust future that America and its international partners are creating,” said Redwire Executive Vice President John Vellinger.  “We are very excited to leverage Redwire’s decades of flight heritage and experience on the International Space Station, providing the vision technology for Orion and numerous other systems, to literally build the foundation of a new era in lunar space exploration and utilization.”

By using local materials to build infrastructure, this new technology would reduce the cost of sending construction materials to the Moon. Redwire’s cutting-edge manufacturing technology will use a microwave emitter to heat and solidify regolith (lunar dust and crushed rock) to construct landing pads, roads, foundations, and dust mitigation surfaces. The technology will be scalable to lunar rovers, vehicles, and robotic arms.

Redwire is leading a team of industry and academic partners to develop this capability, including Astrobotic, Lockheed Martin Space, Lambda Technologies, Colorado School of Mines, and the University of Central Florida.  Redwire will leverage its extensive in-space servicing, assembly, and manufacturing experience, which is being used to develop in-situ resource utilization capabilities and space infrastructure technology for use on the surface of the Moon, Mars, and beyond. Earlier this year, Redwire announced that it is providing its Roll-Out Solar Array technology for Astrobotic’s Lunar Vertical Solar Array Technology program to deliver power on the lunar surface.

Click here to learn about Satellite Solar Panels from Redwire Space.


Publisher: SatNow

GNSS Constellations - A list of all GNSS satellites by constellations

beidou

Satellite NameOrbit Date
BeiDou-3 G4Geostationary Orbit (GEO)17 May, 2023
BeiDou-3 G2Geostationary Orbit (GEO)09 Mar, 2020
Compass-IGSO7Inclined Geosynchronous Orbit (IGSO)09 Feb, 2020
BeiDou-3 M19Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M20Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M21Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 M22Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 I3Inclined Geosynchronous Orbit (IGSO)04 Nov, 2019
BeiDou-3 M23Medium Earth Orbit (MEO)22 Sep, 2019
BeiDou-3 M24Medium Earth Orbit (MEO)22 Sep, 2019

galileo

Satellite NameOrbit Date
GSAT0223MEO - Near-Circular05 Dec, 2021
GSAT0224MEO - Near-Circular05 Dec, 2021
GSAT0219MEO - Near-Circular25 Jul, 2018
GSAT0220MEO - Near-Circular25 Jul, 2018
GSAT0221MEO - Near-Circular25 Jul, 2018
GSAT0222MEO - Near-Circular25 Jul, 2018
GSAT0215MEO - Near-Circular12 Dec, 2017
GSAT0216MEO - Near-Circular12 Dec, 2017
GSAT0217MEO - Near-Circular12 Dec, 2017
GSAT0218MEO - Near-Circular12 Dec, 2017

glonass

Satellite NameOrbit Date
Kosmos 2569--07 Aug, 2023
Kosmos 2564--28 Nov, 2022
Kosmos 2559--10 Oct, 2022
Kosmos 2557--07 Jul, 2022
Kosmos 2547--25 Oct, 2020
Kosmos 2545--16 Mar, 2020
Kosmos 2544--11 Dec, 2019
Kosmos 2534--27 May, 2019
Kosmos 2529--03 Nov, 2018
Kosmos 2527--16 Jun, 2018

gps

Satellite NameOrbit Date
Navstar 82Medium Earth Orbit19 Jan, 2023
Navstar 81Medium Earth Orbit17 Jun, 2021
Navstar 78Medium Earth Orbit22 Aug, 2019
Navstar 77Medium Earth Orbit23 Dec, 2018
Navstar 76Medium Earth Orbit05 Feb, 2016
Navstar 75Medium Earth Orbit31 Oct, 2015
Navstar 74Medium Earth Orbit15 Jul, 2015
Navstar 73Medium Earth Orbit25 Mar, 2015
Navstar 72Medium Earth Orbit29 Oct, 2014
Navstar 71Medium Earth Orbit02 Aug, 2014

irnss

Satellite NameOrbit Date
NVS-01Geostationary Orbit (GEO)29 May, 2023
IRNSS-1IInclined Geosynchronous Orbit (IGSO)12 Apr, 2018
IRNSS-1HSub Geosynchronous Transfer Orbit (Sub-GTO)31 Aug, 2017
IRNSS-1GGeostationary Orbit (GEO)28 Apr, 2016
IRNSS-1FGeostationary Orbit (GEO)10 Mar, 2016
IRNSS-1EGeosynchronous Orbit (IGSO)20 Jan, 2016
IRNSS-1DInclined Geosynchronous Orbit (IGSO)28 Mar, 2015
IRNSS-1CGeostationary Orbit (GEO)16 Oct, 2014
IRNSS-1BInclined Geosynchronous Orbit (IGSO)04 Apr, 2014
IRNSS-1AInclined Geosynchronous Orbit (IGSO)01 Jul, 2013