Redwire Awarded Follow-On Contract from Boeing to Develop Additional Roll-Out Solar Arrays for the ISS

Redwire Awarded Follow-On Contract from Boeing to Develop Additional Roll-Out Solar Arrays for the ISS

Redwire Corporation one of the leaders in space infrastructure for the next-generation space economy, announced that it has been awarded a follow-on contract from Boeing to develop two additional Roll-Out Solar Arrays (IROSA) for the International Space Station.

The IROSAs augment the space station’s power supply to support critical research and space operations. This award is a follow-on to Redwire’s contract to deliver six IROSAs, which were developed in partnership with Boeing’s Spectrolab and delivered to NASA under contract with Boeing, NASA’s prime contractor for space station operations.

“We are proud of the successful deployment of six IROSAs on the ISS to date, making it the gold standard for large-scale power generation with proven flight heritage.  The continuation of the program with the award of an additional two IROSAs, bringing the total to eight arrays, is a testament to the excellence and dedication of our team and the coordination amongst our suppliers and partners,” said Peter Cannito, Redwire Chairman and CEO.

“The six IROSAs installed on the ISS are innovative examples to support further utilization with technologies and systems that were not envisioned when the ISS was designed and built,” said John Mulholland, Boeing vice president, and program manager for the ISS. “It is a tribute to the performance of the design, build, and operational teams that NASA has contracted for two additional arrays to complete the upgrade to the full eight-array set.”

Since 2021, a total of six Redwire-built arrays have been developed, delivered, and deployed on the ISS, augmenting its critical power supply.  Each wing provides an additional 20+ kW of power once deployed, and all eight IROSA wings combined will provide more than 160 kW for over 10 years.

Redwire has continued to advance ROSA technology to power other spaceflight platforms and ambitious missions with reliable and stable power solutions. Redwire is currently building ROSA for the Power and Propulsion Element for NASA’s Gateway program, a part of the agency’s Artemis program, and Astrobotic’s Lunar Vertical Solar Array program, which aims to provide sustainable power on the lunar surface. Along with its previous success on the ISS, ROSA technology powered NASA’s DART spacecraft to impact asteroid Dimorphos, successfully altering the asteroid’s orbit in September 2022.

Click here to view other Solar Arrays from Redwire Space.


Publisher: SatNow

GNSS Constellations - A list of all GNSS satellites by constellations

beidou

Satellite NameOrbit Date
BeiDou-3 G4Geostationary Orbit (GEO)17 May, 2023
BeiDou-3 G2Geostationary Orbit (GEO)09 Mar, 2020
Compass-IGSO7Inclined Geosynchronous Orbit (IGSO)09 Feb, 2020
BeiDou-3 M19Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M20Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M21Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 M22Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 I3Inclined Geosynchronous Orbit (IGSO)04 Nov, 2019
BeiDou-3 M23Medium Earth Orbit (MEO)22 Sep, 2019
BeiDou-3 M24Medium Earth Orbit (MEO)22 Sep, 2019

galileo

Satellite NameOrbit Date
GSAT0223MEO - Near-Circular05 Dec, 2021
GSAT0224MEO - Near-Circular05 Dec, 2021
GSAT0219MEO - Near-Circular25 Jul, 2018
GSAT0220MEO - Near-Circular25 Jul, 2018
GSAT0221MEO - Near-Circular25 Jul, 2018
GSAT0222MEO - Near-Circular25 Jul, 2018
GSAT0215MEO - Near-Circular12 Dec, 2017
GSAT0216MEO - Near-Circular12 Dec, 2017
GSAT0217MEO - Near-Circular12 Dec, 2017
GSAT0218MEO - Near-Circular12 Dec, 2017

glonass

Satellite NameOrbit Date
Kosmos 2569--07 Aug, 2023
Kosmos 2564--28 Nov, 2022
Kosmos 2559--10 Oct, 2022
Kosmos 2557--07 Jul, 2022
Kosmos 2547--25 Oct, 2020
Kosmos 2545--16 Mar, 2020
Kosmos 2544--11 Dec, 2019
Kosmos 2534--27 May, 2019
Kosmos 2529--03 Nov, 2018
Kosmos 2527--16 Jun, 2018

gps

Satellite NameOrbit Date
Navstar 82Medium Earth Orbit19 Jan, 2023
Navstar 81Medium Earth Orbit17 Jun, 2021
Navstar 78Medium Earth Orbit22 Aug, 2019
Navstar 77Medium Earth Orbit23 Dec, 2018
Navstar 76Medium Earth Orbit05 Feb, 2016
Navstar 75Medium Earth Orbit31 Oct, 2015
Navstar 74Medium Earth Orbit15 Jul, 2015
Navstar 73Medium Earth Orbit25 Mar, 2015
Navstar 72Medium Earth Orbit29 Oct, 2014
Navstar 71Medium Earth Orbit02 Aug, 2014

irnss

Satellite NameOrbit Date
NVS-01Geostationary Orbit (GEO)29 May, 2023
IRNSS-1IInclined Geosynchronous Orbit (IGSO)12 Apr, 2018
IRNSS-1HSub Geosynchronous Transfer Orbit (Sub-GTO)31 Aug, 2017
IRNSS-1GGeostationary Orbit (GEO)28 Apr, 2016
IRNSS-1FGeostationary Orbit (GEO)10 Mar, 2016
IRNSS-1EGeosynchronous Orbit (IGSO)20 Jan, 2016
IRNSS-1DInclined Geosynchronous Orbit (IGSO)28 Mar, 2015
IRNSS-1CGeostationary Orbit (GEO)16 Oct, 2014
IRNSS-1BInclined Geosynchronous Orbit (IGSO)04 Apr, 2014
IRNSS-1AInclined Geosynchronous Orbit (IGSO)01 Jul, 2013