General Atomics GAzelle Satellite Successfully Completes Post Launch Acceptance Review

General Atomics GAzelle Satellite Successfully Completes Post Launch Acceptance Review

General Atomics Electromagnetic Systems (GA-EMS) announced that the recently launched GAzelle satellite hosting the Argos-4 and RadMon payloads has successfully completed its on-orbit Post Launch Acceptance Review (PLAR). All components are confirmed in good health and satellite operations are functioning nominally. The RadMon payload commissioning phase has been completed and can begin mission operations.   The Argos-4 Payload has completed its initial on-orbit checkout and has begun its commissioning process which will occur over the next three months.

“We are excited to see the GAzelle satellite performing as anticipated and that our mission control team has successfully confirmed a healthy operational bus environment for the Argos-4 and RadMon instruments to begin their on-orbit 5-year mission,” stated Scott Forney, president of GA-EMS. “With payload checkout completed, the Argos-4 instrument will begin its commissioning phase, and in a few months, it will begin delivering critical real-time data from fixed and mobile sensors to scientists and researchers worldwide as they study changes in the Earth’s environment with the goal of monitoring and protecting our Earth’s oceans and wildlife.”

GA-EMS designed and manufactured the GAzelle satellite, performed all payload integration and testing, and coordinated the launch. GA-EMS owns GAzelle and is managing the satellite on orbit operations from its Spacecraft Mission Operations Center in Colorado. 

“We look forward to having the GAzelle satellite join the Argos constellation as part of an international program to collect and distribute environmental data for use in applications such as ocean buoy tracking, wildlife and fishery monitoring, and maritime security,” said Gregg Burgess, vice president of GA-EMS Space Systems. “GAzelle is the first in a series of spacecraft GA-EMS is building as part of an expanding weather and science program to deliver affordable, high-performance next-generation satellites on-orbit for the collection and relay of global cloud characterization, weather imagery, and environmental data to support research, government, and military customer applications.”

GA-EMS launched the GAzelle spacecraft as a Hosted Payload Solutions (HoPS) mission delivery order for the Argos Advanced Data Collection System (A-DCS) awarded to the company by the U.S. Space Force Space Systems Command on behalf of the National Oceanic and Atmospheric Administration (NOAA). The Argos-4 instrument was provided by France’s National Centre for Space Studies (CNES).

Click here to learn about the Argos worldwide Data Collection System.

Publisher: SatNow
Tags:-  SatelliteLaunchGlobal

GNSS Constellations - A list of all GNSS satellites by constellations

beidou

Satellite NameOrbit Date
BeiDou-3 G4Geostationary Orbit (GEO)17 May, 2023
BeiDou-3 G2Geostationary Orbit (GEO)09 Mar, 2020
Compass-IGSO7Inclined Geosynchronous Orbit (IGSO)09 Feb, 2020
BeiDou-3 M19Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M20Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M21Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 M22Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 I3Inclined Geosynchronous Orbit (IGSO)04 Nov, 2019
BeiDou-3 M23Medium Earth Orbit (MEO)22 Sep, 2019
BeiDou-3 M24Medium Earth Orbit (MEO)22 Sep, 2019

galileo

Satellite NameOrbit Date
GSAT0223MEO - Near-Circular05 Dec, 2021
GSAT0224MEO - Near-Circular05 Dec, 2021
GSAT0219MEO - Near-Circular25 Jul, 2018
GSAT0220MEO - Near-Circular25 Jul, 2018
GSAT0221MEO - Near-Circular25 Jul, 2018
GSAT0222MEO - Near-Circular25 Jul, 2018
GSAT0215MEO - Near-Circular12 Dec, 2017
GSAT0216MEO - Near-Circular12 Dec, 2017
GSAT0217MEO - Near-Circular12 Dec, 2017
GSAT0218MEO - Near-Circular12 Dec, 2017

glonass

Satellite NameOrbit Date
Kosmos 2569--07 Aug, 2023
Kosmos 2564--28 Nov, 2022
Kosmos 2559--10 Oct, 2022
Kosmos 2557--07 Jul, 2022
Kosmos 2547--25 Oct, 2020
Kosmos 2545--16 Mar, 2020
Kosmos 2544--11 Dec, 2019
Kosmos 2534--27 May, 2019
Kosmos 2529--03 Nov, 2018
Kosmos 2527--16 Jun, 2018

gps

Satellite NameOrbit Date
Navstar 82Medium Earth Orbit19 Jan, 2023
Navstar 81Medium Earth Orbit17 Jun, 2021
Navstar 78Medium Earth Orbit22 Aug, 2019
Navstar 77Medium Earth Orbit23 Dec, 2018
Navstar 76Medium Earth Orbit05 Feb, 2016
Navstar 75Medium Earth Orbit31 Oct, 2015
Navstar 74Medium Earth Orbit15 Jul, 2015
Navstar 73Medium Earth Orbit25 Mar, 2015
Navstar 72Medium Earth Orbit29 Oct, 2014
Navstar 71Medium Earth Orbit02 Aug, 2014

irnss

Satellite NameOrbit Date
NVS-01Geostationary Orbit (GEO)29 May, 2023
IRNSS-1IInclined Geosynchronous Orbit (IGSO)12 Apr, 2018
IRNSS-1HSub Geosynchronous Transfer Orbit (Sub-GTO)31 Aug, 2017
IRNSS-1GGeostationary Orbit (GEO)28 Apr, 2016
IRNSS-1FGeostationary Orbit (GEO)10 Mar, 2016
IRNSS-1EGeosynchronous Orbit (IGSO)20 Jan, 2016
IRNSS-1DInclined Geosynchronous Orbit (IGSO)28 Mar, 2015
IRNSS-1CGeostationary Orbit (GEO)16 Oct, 2014
IRNSS-1BInclined Geosynchronous Orbit (IGSO)04 Apr, 2014
IRNSS-1AInclined Geosynchronous Orbit (IGSO)01 Jul, 2013