GITAI Completes Successful Launch of In-House Developed 16U Satellite

GITAI Completes Successful Launch of In-House Developed 16U Satellite

GITAI USA (GITAI), the world's leading space robotics startup, is excited to announce the successful launch and full mission success of its in-house developed 16U-sized satellite. The satellite was launched into low Earth orbit aboard SpaceX's Falcon 9 at 3:34 AM (PST) on December 21, 2024. The mission achieved "Full Success" by meeting all three predefined success criteria for the satellite's technical verification.

Revolutionizing Space Operations: GITAI's Mission

To achieve its goal of reducing the cost of space operations by 100 times, GITAI is developing cutting-edge technologies, including robotic satellites for on-orbit services, lunar robotic rovers for infrastructure construction, and inchworm-type robotic arms capable of operating in both domains. All of these technologies are developed entirely in-house.

Since its inception, GITAI has established a robust system for the in-house production of space-grade robotic systems. This includes the development of a robotic arm that achieved full mission success during demonstrations inside the ISS in 2021 and outside the ISS in 2024.

In January 2024, GITAI expanded its focus to include the in-house development of satellite technology, including major components, to enable comprehensive on-orbit services. As part of this effort, the company developed and successfully launched its first satellite demonstration, the 16U-sized SC1, at 3:34 AM (PST) on December 21, 2024, via SpaceX's Falcon 9 rideshare mission (Bandwagon 2).

Mission Accomplishment: Full Success

The satellite demonstration achieved "Full Success" by meeting all three of the following success criteria:

1. Reliable Communication: Establishing reliable communication between the GITAI satellite and the Mission Control Center at GITAI's Torrance, California office.

2. System Functionality: Confirming the proper functionality of all onboard sensors, actuators, and computers, including attitude control via reaction wheels and orbital maneuvers using propulsion systems.

3. Data Acquisition: Successfully capturing and transmitting image and video data from the satellite.

Key Outcomes of the Demonstration

Through the successful development and demonstration of the 16U satellite, GITAI has acquired the following key capabilities:

1. Capability to Develop Robotic Satellites for On-Orbit Services

With the success of this satellite demonstration, combined with the 2024 robotic arm demonstration outside the ISS, GITAI has proven its ability to develop satellites equipped with robotic arms for on-orbit services. This milestone positions GITAI to provide cost-effective and efficient on-orbit services to U.S. government agencies and private sector clients. GITAI plans to demonstrate rendezvous and docking capabilities in its upcoming Space Demonstration Experiment (S3) in 2026. This mission will involve a 500kg-class satellite equipped with  a robotic arm and a target satellite, further validating GITAI's on-orbit service capabilities.

2. Capability to Develop and Sell Space-Qualified Satellite Bus Components (TRL-9)

The successful demonstration of the SC1 satellite has validated GITAI's ability to develop and produce space-qualified (TRL-9) satellite bus components in-house. These components will not only support GITAI's on-orbit service missions but also be offered to customers for low Earth orbit constellation applications. Although some components of the SC1 satellite were procured externally, GITAI is actively developing high-cost, long-lead-time components in-house, including electric and chemical propulsion systems, reaction wheels, magnetorquers, and star trackers. By completing this development by 2025, GITAI aims to further reduce costs, shorten lead times, and enhance profit margins.

3. Capability to Act as a Prime Contractor for Independent Spacecraft

This demonstration establishes GITAI as a prime contractor with end-to-end capabilities, including the design and in-house development of spacecraft, launch coordination, payload delivery, and spacecraft operations from its control center. With these capabilities, GITAI is poised to secure contracts from U.S. government agencies and accelerate its role as a leader in the space robotics industry.

GITAI remains committed to its mission of reducing the cost of space operations by 100 times through continued advancements in in-house development and its efforts to deliver on-orbit services and lunar infrastructure construction solutions.

Click here to learn more about GITAI's Future Projects for Lunar Exploration

Publisher: SatNow

GNSS Constellations - A list of all GNSS satellites by constellations

beidou

Satellite NameOrbit Date
BeiDou-3 G4Geostationary Orbit (GEO)17 May, 2023
BeiDou-3 G2Geostationary Orbit (GEO)09 Mar, 2020
Compass-IGSO7Inclined Geosynchronous Orbit (IGSO)09 Feb, 2020
BeiDou-3 M19Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M20Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M21Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 M22Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 I3Inclined Geosynchronous Orbit (IGSO)04 Nov, 2019
BeiDou-3 M23Medium Earth Orbit (MEO)22 Sep, 2019
BeiDou-3 M24Medium Earth Orbit (MEO)22 Sep, 2019

galileo

Satellite NameOrbit Date
GSAT0223MEO - Near-Circular05 Dec, 2021
GSAT0224MEO - Near-Circular05 Dec, 2021
GSAT0219MEO - Near-Circular25 Jul, 2018
GSAT0220MEO - Near-Circular25 Jul, 2018
GSAT0221MEO - Near-Circular25 Jul, 2018
GSAT0222MEO - Near-Circular25 Jul, 2018
GSAT0215MEO - Near-Circular12 Dec, 2017
GSAT0216MEO - Near-Circular12 Dec, 2017
GSAT0217MEO - Near-Circular12 Dec, 2017
GSAT0218MEO - Near-Circular12 Dec, 2017

glonass

Satellite NameOrbit Date
Kosmos 2569--07 Aug, 2023
Kosmos 2564--28 Nov, 2022
Kosmos 2559--10 Oct, 2022
Kosmos 2557--07 Jul, 2022
Kosmos 2547--25 Oct, 2020
Kosmos 2545--16 Mar, 2020
Kosmos 2544--11 Dec, 2019
Kosmos 2534--27 May, 2019
Kosmos 2529--03 Nov, 2018
Kosmos 2527--16 Jun, 2018

gps

Satellite NameOrbit Date
Navstar 82Medium Earth Orbit19 Jan, 2023
Navstar 81Medium Earth Orbit17 Jun, 2021
Navstar 78Medium Earth Orbit22 Aug, 2019
Navstar 77Medium Earth Orbit23 Dec, 2018
Navstar 76Medium Earth Orbit05 Feb, 2016
Navstar 75Medium Earth Orbit31 Oct, 2015
Navstar 74Medium Earth Orbit15 Jul, 2015
Navstar 73Medium Earth Orbit25 Mar, 2015
Navstar 72Medium Earth Orbit29 Oct, 2014
Navstar 71Medium Earth Orbit02 Aug, 2014

irnss

Satellite NameOrbit Date
NVS-01Geostationary Orbit (GEO)29 May, 2023
IRNSS-1IInclined Geosynchronous Orbit (IGSO)12 Apr, 2018
IRNSS-1HSub Geosynchronous Transfer Orbit (Sub-GTO)31 Aug, 2017
IRNSS-1GGeostationary Orbit (GEO)28 Apr, 2016
IRNSS-1FGeostationary Orbit (GEO)10 Mar, 2016
IRNSS-1EGeosynchronous Orbit (IGSO)20 Jan, 2016
IRNSS-1DInclined Geosynchronous Orbit (IGSO)28 Mar, 2015
IRNSS-1CGeostationary Orbit (GEO)16 Oct, 2014
IRNSS-1BInclined Geosynchronous Orbit (IGSO)04 Apr, 2014
IRNSS-1AInclined Geosynchronous Orbit (IGSO)01 Jul, 2013