Redwire Prepares for Delivery of Satellites For Proba-3 Mission in the Fourth Quarter

Redwire Prepares for Delivery of Satellites For Proba-3 Mission in the Fourth Quarter

Redwire Corporation, a company in space infrastructure for the next generation space economy, announced that it is finalizing integration and preparing for delivery of two satellites for the European Space Agency’s (ESA) Proba-3 mission later the in fourth quarter of this year. Simultaneously, Redwire has started spacecraft integration for two other ESA satellite missions, the Atmospheric Limb Tracker for Investigation of the Upcoming Stratosphere (ALTIUS) and one of the In-Orbit Demonstration and Verification (Horizon 2020 IOD/IOV) satellites, funded by the European Union, at its state-of-the-art facility in Kruibeke, Belgium.

Redwire’s Belgium facility has emerged as a world-class satellite processing facility for major ESA missions. Redwire is the prime contractor for the ALTIUS and one of the ESA-European Commission Horizon 2020 IOD/IOV missions, which are built on Redwire’s P200 platform and feature Redwire’s third-generation Advanced Data and Power Management System avionics. For Proba-3, Redwire is responsible for spacecraft integration, testing, and the onboard computer. Redwire is also responsible for the integration, testing, and the development of one of the technology demonstration payloads: the 3D Energetic Electron Spectrometer, a high-fidelity 3D energetic electron spectrometer.

It is a privilege to be supporting ESA and our other partners to advance these game-changing European space missions,” said Erik Masure, President, Redwire Space Europe. “Redwire has a long and successful legacy of building satellites for important ESA missions, including previous PROBA missions, allowing us to work closely with ESA as well as a variety of other customers and partners across Europe to support critical scientific advancement and technological innovation happening around the world.”

Redwire’s Belgium facility has more than 40 years of spaceflight heritage developing spacecraft platforms and success delivering innovative technology for game-changing ESA programs. Redwire was the prime contractor for ESA’s PROBA-1, PROBA-2, and PROBA-V missions, which have a combined flight time of nearly 50 years without failure. Leveraging its legacy of innovation and excellence, Redwire continues to support other game-changing ESA programs, including Skimsat, which will be a technology demonstrator for a small satellite platform designed to operate in very low Earth orbit; the International Berthing and Docking Mechanism for the lunar Gateway; and the Hera mission to study the Didymos binary asteroid system, which just launched successfully with Redwire’s onboard computer.

Click here to learn more about European Space Agency's Proba-3 Space Mission

Publisher: SatNow
Tags:-  SatelliteLaunchGround

GNSS Constellations - A list of all GNSS satellites by constellations

beidou

Satellite NameOrbit Date
BeiDou-3 G4Geostationary Orbit (GEO)17 May, 2023
BeiDou-3 G2Geostationary Orbit (GEO)09 Mar, 2020
Compass-IGSO7Inclined Geosynchronous Orbit (IGSO)09 Feb, 2020
BeiDou-3 M19Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M20Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M21Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 M22Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 I3Inclined Geosynchronous Orbit (IGSO)04 Nov, 2019
BeiDou-3 M23Medium Earth Orbit (MEO)22 Sep, 2019
BeiDou-3 M24Medium Earth Orbit (MEO)22 Sep, 2019

galileo

Satellite NameOrbit Date
GSAT0223MEO - Near-Circular05 Dec, 2021
GSAT0224MEO - Near-Circular05 Dec, 2021
GSAT0219MEO - Near-Circular25 Jul, 2018
GSAT0220MEO - Near-Circular25 Jul, 2018
GSAT0221MEO - Near-Circular25 Jul, 2018
GSAT0222MEO - Near-Circular25 Jul, 2018
GSAT0215MEO - Near-Circular12 Dec, 2017
GSAT0216MEO - Near-Circular12 Dec, 2017
GSAT0217MEO - Near-Circular12 Dec, 2017
GSAT0218MEO - Near-Circular12 Dec, 2017

glonass

Satellite NameOrbit Date
Kosmos 2569--07 Aug, 2023
Kosmos 2564--28 Nov, 2022
Kosmos 2559--10 Oct, 2022
Kosmos 2557--07 Jul, 2022
Kosmos 2547--25 Oct, 2020
Kosmos 2545--16 Mar, 2020
Kosmos 2544--11 Dec, 2019
Kosmos 2534--27 May, 2019
Kosmos 2529--03 Nov, 2018
Kosmos 2527--16 Jun, 2018

gps

Satellite NameOrbit Date
Navstar 82Medium Earth Orbit19 Jan, 2023
Navstar 81Medium Earth Orbit17 Jun, 2021
Navstar 78Medium Earth Orbit22 Aug, 2019
Navstar 77Medium Earth Orbit23 Dec, 2018
Navstar 76Medium Earth Orbit05 Feb, 2016
Navstar 75Medium Earth Orbit31 Oct, 2015
Navstar 74Medium Earth Orbit15 Jul, 2015
Navstar 73Medium Earth Orbit25 Mar, 2015
Navstar 72Medium Earth Orbit29 Oct, 2014
Navstar 71Medium Earth Orbit02 Aug, 2014

irnss

Satellite NameOrbit Date
NVS-01Geostationary Orbit (GEO)29 May, 2023
IRNSS-1IInclined Geosynchronous Orbit (IGSO)12 Apr, 2018
IRNSS-1HSub Geosynchronous Transfer Orbit (Sub-GTO)31 Aug, 2017
IRNSS-1GGeostationary Orbit (GEO)28 Apr, 2016
IRNSS-1FGeostationary Orbit (GEO)10 Mar, 2016
IRNSS-1EGeosynchronous Orbit (IGSO)20 Jan, 2016
IRNSS-1DInclined Geosynchronous Orbit (IGSO)28 Mar, 2015
IRNSS-1CGeostationary Orbit (GEO)16 Oct, 2014
IRNSS-1BInclined Geosynchronous Orbit (IGSO)04 Apr, 2014
IRNSS-1AInclined Geosynchronous Orbit (IGSO)01 Jul, 2013